[1] A. Estévez-Fernández, A game theoretical approach to sharing penalties and rewards in projects, European Journal of Operational Research, 216(3) (2012) 647-657.
[2] A. Hafezalkotob, E. Hosseinpour, M. Moradi, K. Khalili-Damghani, Multi-resource trade-off problem of the project contractors in a cooperative environment: highway construction case study, International Journal of Management Science and Engineering Management, 13(2) (2018) 129-138.
[3] M.B. Shishehgarkhaneh, M. Azizi, M. Basiri, R.C. Moehler, BIM-based resource tradeoff in project scheduling using fire hawk optimizer (FHO), Buildings, 12(9) (2022) 1472.
[4] M. Azizi, M. Baghalzadeh Shishehgarkhaneh, M. Basiri, R.C. Moehler, Squid Game Optimizer (SGO): a novel metaheuristic algorithm, Scientific Reports, 13(1) (2023) 5373.
[5] W. Hu, X. He, An innovative time-cost-quality tradeoff modeling of building construction project based on resource allocation, The Scientific World Journal, 2014 (2014).
[6] M.E. Bayraktar, M. Hastak, S. Gokhale, B. Safi, Decision tool for selecting the optimal techniques for cost and schedule reduction in capital projects, Journal of Construction Engineering and Management, 137(9) (2011) 645-655.
[7] S.A. Banihashemi, M. Khalilzadeh, Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach, Engineering, Construction and Architectural Management, (2020).
[8] M. Baghalzadeh Shishehgarkhaneh, S. Fard Moradinia, The role of Building Information Modeling (BIM) in reducing the number of project dispute resolution sessions, in: Proceedings of the 8th National Conference on Civil Engineering, Architecture and Sustainable Urban Development of Iran, Mashhad, Iran, 2020.
[9] M.B. Orm, J. Jeunet, Time cost quality trade-off problems: a survey exploring the assessment of quality, Computers & Industrial Engineering, 118 (2018) 319-328.
[10] K. Kim, J. Walewski, Y. Cho, Multiobjective Construction Schedule Optimization Using Modified Niched Pareto Genetic Algorithm, Journal of Management in Engineering, 32 (2015) 04015038.
[11] M. Azizi, A.W. Mohamed, M.B. Shishehgarkhaneh, Optimum design of truss structures with atomic orbital search considering discrete design variables, in: Handbook of Nature-Inspired Optimization Algorithms: The State of the Art, Springer, 2022, pp. 189-214.
[12] M. Baghalzadeh Shishehgarkhaneh, S. Fard Moradinia, A. Keivani, Time and cost management of dam construction projects based on Building Information Modeling (BIM)(A Case Study in Kurdistan Province), in: Proceedings of the 7th International Congress on Civil Engineering, Architecture and Urban Development, Tehran, Iran, 2021, pp. 7-9.
[13] C.-W. Feng, L. Liu, S. Burns, Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems, Journal of Computing in Civil Engineering - J COMPUT CIVIL ENG, 11 (1997).
[14] B. Rao, A. R, Time Cost Optimization Techniques in Construction Industries-A Review Article, 5 (2015) 28-32.
[15] A.-P. Chassiakos, C.-I. Samaras, D.-D. Theodorakopoulos, An Integer Programming Method for CPM Time-Cost Analysis, Computer Modeling in Engineering \& Sciences, 1(4) (2000) 9--18.
[16] M. Azizi, S. Talatahari, M. Basiri, M.B. Shishehgarkhaneh, Optimal design of low-and high-rise building structures by Tribe-Harmony Search algorithm, Decision Analytics Journal, (2022) 100067.
[17] C.M. Eastman, C. Eastman, P. Teicholz, R. Sacks, K. Liston, BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors, John Wiley & Sons, 2011.
[18] M. Gray, J. Gray, M. Teo, S. Chi, F. Lamari, Building information modelling: an international survey, in: Proceedings of the 19th International CIB World Building Congress, Brisbane 2013: Construction and Society, Queensland University of Technology, 2013, pp. 1-14.
[19] D. Bryde, M. Broquetas, J.M. Volm, The project benefits of building information modelling (BIM), International journal of project management, 31(7) (2013) 971-980.
[20] R. Volk, J. Stengel, F. Schultmann, Building Information Modeling (BIM) for existing buildings—Literature review and future needs, Automation in construction, 38 (2014) 109-127.
[21] M. Baghalzadeh Shishehgarkhaneh, A. Keivani, R.C. Moehler, N. Jelodari, S. Roshdi Laleh, Internet of Things (IoT), Building Information Modeling (BIM), and Digital Twin (DT) in Construction Industry: A Review, Bibliometric, and Network Analysis, Buildings, 12(10) (2022) 1503.
[22] S. Talatahari, M. Azizi, M. Toloo, M. Baghalzadeh Shishehgarkhaneh, Optimization of Large-Scale Frame Structures Using Fuzzy Adaptive Quantum Inspired Charged System Search, International Journal of Steel Structures, 22(3) (2022) 686-707.
[23] S. Azhar, M. Khalfan, T. Maqsood, Building information modeling (BIM): now and beyond, Australasian Journal of Construction Economics and Building, The, 12(4) (2012) 15-28.
[24] S. Azhar, Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry, Leadership and management in engineering, 11(3) (2011) 241-252.
[25] A.H. Daqiqnia, S. Fard Moradinia, M. Baghalzadeh Shishehgarkhaneh, Toward Nearly Zero Energy Building Designs: A Comparative Study of Various Techniques, AUT Journal of Civil Engineering, 5(2) (2021) 12-12.
[26] M.B. Shishehgarkhaneh, R.C. Moehler, S.F. Moradinia, Blockchain in the Construction Industry between 2016 and 2022: A Review, Bibliometric, and Network Analysis, Smart Cities, 6(2) (2023) 819-845.
[27] S. Hire, S. Sandbhor, K. Ruikar, Bibliometric survey for adoption of building information modeling (BIM) in construction industry–a safety perspective, Archives of computational methods in engineering, 29(1) (2022) 679-693.
[28] F. Araya, State of the art of the use of BIM for resolution of claims in construction projects Estado del arte del uso de BIM para la resolución de demandas en proyectos de construcción.
[29] F. Morales, R.F. Herrera, F.M.-L. Rivera, E. Atencio, M. Nuñez, Potential Application of BIM in RFI in Building Projects, Buildings, 12(2) (2022) 145.
[30] M. Sherif, K. Nassar, O. Hosny, S. Safar, I. Abotaleb, Automated BIM-based structural design and cost optimization model for reinforced concrete buildings, Scientific Reports, 12(1) (2022) 1-18.
[31] M. Azizi, U. Aickelin, H. A. Khorshidi, M. Baghalzadeh Shishehgarkhaneh, Energy valley optimizer: a novel metaheuristic algorEnergy Valley Optimizer (EVO) ithm for global and engineering optimization, Scientific Reports, 13(1) (2023) 226.
[32] M. Ranjbar, B. De Reyck, F. Kianfar, A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling, European Journal of Operational Research, 193(1) (2009) 35-48.
[33] E. Demeulemeester, B. De reyck, W. Herroelen, The discrete time/resource trade-off problem in project networks: a branch-and-bound approach, IIE Transactions, 32(11) (2000) 1059-1069.
[34] D.-T. Nguyen, J.-S. Chou, D.-H. Tran, Integrating a novel multiple-objective FBI with BIM to determine tradeoff among resources in project scheduling, Knowledge-Based Systems, 235 (2022) 107640.
[35] S. Nasiri, M. Lu, Streamlined project time-cost tradeoff optimization methodology: Algorithm, automation, and application, Automation in Construction, 133 (2022) 104002.
[36] M. Baghalzadeh Shishehgarkhaneh, S.F. Moradinia, A. Keivani, M. Azizi, Application of Classic and Novel Metaheuristic Algorithms in a BIM-Based Resource Tradeoff in Dam Projects, Smart Cities, 5(4) (2022) 1441-1464.
[37] M. Azizi, Atomic orbital search: A novel metaheuristic algorithm, Applied Mathematical Modelling, 93 (2021) 657-683.
[38] K. Sharma, M.K. Trivedi, AHP and NSGA-II-based Time–Cost–Quality Trade-Off optimization model for construction projects, in: Artificial Intelligence and Sustainable Computing, Springer, 2022, pp. 45-63.
[39] D.-H. Tran, P.B. Tarigan, Time Cost Quality Trade-Off in Repetitive Construction Project for Sustainable Construction Project, in: Sustainability Management Strategies and Impact in Developing Countries, Emerald Publishing Limited, 2022.
[40] H. Zahid, O. Elmansoury, R. Yaagoubi, Dynamic Predicted Mean Vote: An IoT-BIM integrated approach for indoor thermal comfort optimization, Automation in Construction, 129 (2021) 103805.
[41] X. Chen, Y. Zhu, H. Chen, Y. Ouyang, X. Luo, X. Wu, BIM-based optimization of camera placement for indoor construction monitoring considering the construction schedule, Automation in Construction, 130 (2021) 103825.
[42] M.-Y. Cheng, N.-W. Chang, Dynamic construction material layout planning optimization model by integrating 4D BIM, Engineering with Computers, 35(2) (2019) 703-720.
[43] E. Frías, L. Díaz-Vilariño, J. Balado, H. Lorenzo, From BIM to Scan Planning and Optimization for Construction Control, Remote Sensing, 11(17) (2019) 1963.
[44] S. Song, E. Marks, Construction site path planning optimization through BIM, in: Computing in Civil Engineering 2019: Visualization, Information Modeling, and Simulation, American Society of Civil Engineers Reston, VA, 2019, pp. 369-376.
[45] H. Liu, M. Al-Hussein, M. Lu, BIM-based integrated approach for detailed construction scheduling under resource constraints, Automation in Construction, 53 (2015) 29-43.
[46] H. Moon, H. Kim, V.R. Kamat, L. Kang, BIM-Based Construction Scheduling Method Using Optimization Theory for Reducing Activity Overlaps, Journal of Computing in Civil Engineering, 29(3) (2015) 04014048.
[47] H. Moon, H. Kim, C. Kim, L. Kang, Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces, Automation in Construction, 39 (2014) 93–105.
[48] V. Faghihi, K.F. Reinschmidt, J.H. Kang, Construction scheduling using Genetic Algorithm based on Building Information Model, Expert Systems with Applications, 41(16) (2014) 7565-7578.
[49] K. Le, I. Fung, V. Tam, Y.M. Yip, E.W.M. Lee, Building Information Modeling using Hardware Genetic Algorithms with Field-Programmable Gate Arrays, International Journal of Information Technology Project Management, 5 (2014) 24-49.
[50] Y.-J. Chen, C.-W. Feng, Y.-R. Wang, H.-M. Wu, Using BIM Model and Genetic Algorithms to Optimize The Crew Assignment for Construction Project Planning, International Journal of Technology, 2 (2011) 179-188.
[51] A. Panwar, K.N. Jha, Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model, Journal of Construction Engineering and Management, 147(2) (2021) 04020160.
[52] L. Zhang, J. Du, S. Zhang, Solution to the time-cost-quality trade-off problem in construction projects based on immune genetic particle swarm optimization, Journal of Management in Engineering, 30(2) (2014) 163-172.
[53] K.S. Al-Gahtani, Float Allocation Using the Total Risk Approach, Journal of Construction Engineering and Management, 135(2) (2009) 88-95.
[54] J.M.d.l. Garza, A. Prateapusanond, N. Ambani, Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract, Journal of Construction Engineering and Management, 133(11) (2007) 836-845.
[55] L.D. Long, D.-H. Tran, P.T. Nguyen, Hybrid multiple objective evolutionary algorithms for optimising multi-mode time, cost and risk trade-off problem, International Journal of Computer Applications in Technology, 60(3) (2019) 203-214.
[56] D. Aleksendrić, P. Carlone, 5 - Composite materials – modelling, prediction and optimization, in: D. Aleksendrić, P. Carlone (Eds.) Soft Computing in the Design and Manufacturing of Composite Materials, Woodhead Publishing, Oxford, 2015, pp. 61-289.
[57] V. Hayyolalam, A.A. Pourhaji Kazem, Black Widow Optimization Algorithm: A novel meta-heuristic approach for solving engineering optimization problems, Engineering Applications of Artificial Intelligence, 87 (2020) 103249.
[58] T. Rahkar Farshi, Battle royale optimization algorithm, Neural Computing and Applications, 33(4) (2021) 1139-1157.
[59] A. Kaveh, M.R. Seddighian, E. Ghanadpour, Black Hole Mechanics Optimization: a novel meta-heuristic algorithm, Asian Journal of Civil Engineering, 21(7) (2020) 1129-1149.