[1] M. Parsa, M. Kefayatimolkabad, Obstacles to the implementation of Building Information Modeling (BIM) process in Iran, in: 1th international conference on Building Information Modeling in Iran. 2017.
[2] A. Hejratilahijani, M. Vafamehr, A. Olahi, V. Ahmadi, M. Mofidishemirani, Explaining the pattern of efficiency of new technology and materials in order to prevent wastage of residential building materials and sustainable development of Iran, Quarterly of Geography (Regional Planning), 12(1) (2021) 475-496.
[3] P. Nguyen, R. Akhavian, Synergistic effect of integrated project delivery, lean construction, and building information modeling on project performance measures: a quantitative and qualitative analysis, Advances in Civil Engineering, (2019).
[4] M. Ataiyan, F. Asadimalekjahan, Comparative comparison of building industrialization method with traditional method with emphasis on time, cost and quality, journal of Architecture and Urban Planning of Iran, 2(11) (2018).
[5] H.a.C.D. Ministry of Roads and Urban Development, in: 10th issue of national building regulations, 2022.
[6] G. Heravi, M. Layegheh, Study and Evaluation of Prefabricated Concrete Buildings Industry by SWOT Analysis: Sustainable Development Approach, Amirkabir Journal of Civil Engineering, 49(3) (2017) 603-618.
[8] National Conference of Professional Builders of Housing and Construction, Yazd, 2022.
[9] M. Azizi, S. Taheripour, V. Faghihi, Correction: Cost-benefit analysis of building information modeling implementation in construction projects: evidence from Iran, Iran Journal of Computer Science, 7(4) (2024) 875-875.
[10] P. Alaedini, Toward a capability approach to development and industrialization in Iran: An introduction, Industrial, trade, and employment policies in Iran: Towards a new agenda, (2018) 1-28.
[11] P. Samadi, Investigating the impact of BIM on reducing barriers to off-site construction in construction projects, in: Faulty of art, Tarbiat Modares University: Tehran, Iran, 2021.
[12] H. Ismail, S. Kaliannan, M.R. Hamzah, The Future Directions of IBS Prefabrication Implementation in the Construction Industry. in: Proceeding of 5th International Conference on Advances in Manufacturing and Materials Engineering: ICAMME 2022, 9—10 August, Kuala Lumpur, Malaysia, 2023.
[13] Q. Wang, C. Shen, Z. G, K. Zhu, J. Zhang, M. Huang, Research on the Barriers and Strategies to Promote Prefabricated Buildings in China, Buildings, 13(5) (2023) 1200.
[14] L. Luo, Y. Li, X. Wang, X. Jin, Supply Chain Vulnerability in Prefabricated Building Projects and Digital Mitigation Technologies, IEEE Transactions on Engineering Management, (2023).
[15] D. Lee, Sh. Lee, Digital twin for supply chain coordination in modular construction, Applied Sciences, 11(13) (2021) 5909.
[16] S. Demirkesen, A. Tezel, Investigating major challenges for industry 4.0 adoption among construction companies. Engineering, Construction and Architectural Management, 29(3) (2022) 1470-1503.
[17] A. Sawhney, M. Riley, J. Irizarry, Construction 4.0., Eds, 2020.
[18] X. Yin, H. Liu, Y. Chen, M. Al-Hussein, Building information modelling for off-site construction: Review and future directions, Automation in construction, 101 (2019) 72-91.
[19] MM. Rahman, Barriers of implementing modern methods of construction, Journal of management in engineering, 30(1) (2014) 69-77.
[20] G. Girmscheid, New Perspective of Industrialisation In Construction. in Malaysia IBS International Exhibition 2011 (MIIE 2011), Malaysia IBS International Exhibition, 2011.
[21] M. Azman, M.S.S. Ahmad, T.A. Majid, M.H. Hanafi, Perspective of Malaysian industrialized building system on the modern method of construction, in: 11th Asia Pacific Industrial Engineering and Management Systems Conference, Melaka, Malaysia, 2010.
[22] M. Pan, T. Linner, W. Pan, H. Cheng, T. Bock, Influencing factors of the future utilisation of construction robots for buildings: A Hong Kong perspective, Journal of Building Engineering, 30 (2020) 101220.
[23] AM. Alawag, WS. Alaloul, MS. Liew, AO. Baarimah, MA. Musarat, AL. Al-Mekhlafi, The Role of the Total-Quality-Management (TQM) Drivers in Overcoming the Challenges of Implementing TQM in Industrialized-Building-System (IBS) Projects in Malaysia: Experts’ Perspectives, Sustainability,. 15(8) (2023) 6607.
[24] A.M. Al-Awag, W.S. Alaloul, M.S. Liew, A.O. Baarimah, M.A. Musarat, The potential role of industrialized building systems (IBS) in Malaysian sustainable construction: Awareness and barriers, in: AIP Conference Proceedings, 2023.
[25] R. Jiang, C. Mao, L. Hou, C. Wu, J. Tan, A SWOT analysis for promoting off-site construction under the backdrop of China’s new urbanisation, Journal of Cleaner Production, 173 (2018) 225-234.
[26] JS. Goulding, F. Pour-rahimian, M. Arif, Offsite construction: strategic priorities for shaping the future research agenda, Journal of Architectoni. ca, 1(1) (2012) 62-73.
[27] D.T. Matt, E. Rauch, V. Franzellin, SMART reconfigurability approach in manufacture of steel and façade constructions, in: Enabling manufacturing competitiveness and economic sustainability: Proceedings of the 5th International Conference on Changeable, Agile, Reconfigurable and Virtual Production (CARV 2013), Munich, Germany, October 6th-9th, 2014.
[26] W. Nadim, J.S. Goulding, Offsite production in the UK: the way forward? A UK construction industry perspective. Construction innovation, 10(2) (2010) 181-202.
[27] R. Lopez, H.-Y. Chong, C. Pereira, Obstacles Preventing the Off-Site Prefabrication of Timber and MEP Services: Qualitative Analyses from Builders and Suppliers in Australia, Buildings, 12(7) (2022)1044.
[28] Nadim, W. and J.S. Goulding, Offsite production in the UK: the way forward? A UK construction industry perspective, Construction innovation, 10(2) (2010) 181-202.
[29] R. Lopez, H.-Y. Chong, C. Pereira, Obstacles Preventing the Off-Site Prefabrication of Timber and MEP Services: Qualitative Analyses from Builders and Suppliers in Australia. Buildings, 12(7) (2022) 1044.
[30] E. Rauch, D.T. Matt, P. Dallasega, Mobile On-site Factories—Scalable and distributed manufacturing systems for the construction industry, in: 2015 International Conference on Industrial Engineering and Operations Management (IEOM), 2015.
[31] S. Srisangeerthanan, M.J. Hashemi, P. Rajeev, E. Gad, S. Fernando, Review of performance requirements for inter-module connections in multi-story modular buildings, Journal of Building Engineering, 28 (2020) 101087.
[32] S. Martínez, A. Jardon, J. Gonzalez, C. Balaguer, Flexible field factory for construction industry, Assembly Automation, 33(2) (2013) 175-183.
[33] I.Y. Wuni, G.Q. Shen, Critical success factors for modular integrated construction projects: A review. Building research & information, 48(7) (2020) 763-784.
[34] E. Attouri, Z. Lafhaj, L. Ducoulombier, The current use of industrialized construction techniques in France: Benefits, limits and future expectations, Cleaner Engineering and Technology, 7 (2022) 100436.
[35] E. Korpi-Tassi, Resource allocation benefits: developing project portfolio management process, 2019.
[36] N. Zeng, M. König, J. Teizer, Off-site guarding: look-ahead supply scheduling for risk indication with BIM, in: ANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION, 2017.
[37] Y. Zhai, R.Y. Zhong, G.Q. Huang, Towards operational hedging for logistics uncertainty management in prefabrication construction, IFAC-PapersOnLine, 48(3) (2015) 1128-1133.
[38] M. Pan, T. Linner, W. Pan, H. Cheng, T. Bock, A framework of indicators for assessing construction automation and robotics in the sustainability context, Journal of Cleaner Production, 182 (2018) 82-95.
[39] T. Bock, The future of construction automation: Technological disruption and the upcoming ubiquity of robotics, Automation in construction, 59 (2015) 113-121.
[40] A. Rashid, M.R. Abdullah, D. Ismail, M.N. Mahyuddin, Towards automation and robotics in industrialised building system (IBS): a literature review, (2018).
[41] D. Liu, X. Li, J. Chen, R. Jin, Real-time optimization of precast concrete component transportation and storage, Advances in Civil Engineering, (2020) 1-18.
[42] M. Valinejadshoubi, A. Bagchi, O. Moselhi, Damage detection for prefabricated building modules during transportation, Automation in Construction, 142 (2022) 104466.
[43] J. Yin, R. Huang, H. Sun, S. Cai, A Multi-Objective Optimization Model for Prefabricated Construction Integrating Production, Transportation, and Assembly.
[44] H. Ma, H. Zhang, P. Chang, 4D-based workspace conflict detection in prefabricated building constructions, Journal of Construction Engineering and Management, 146(9) (2020) 04020112.
[45] S.H. Han, S. Hasan, A. Bouferguene, M. Al-Hussein, J. Kosa, Utilization of 3D visualization of mobile crane operations for modular construction on-site assembly, Journal of Management in Engineering, 31(5) (2015) 04014080.
[46] Z. Zheng, Z. Zhang, W. Pan, Virtual prototyping-and transfer learning-enabled module detection for modular integrated construction, Automation in Construction, 120 (2020) 103387.
[47] Z. Liu, X. Meng, Z. Xing, A. Jiang, Digital twin-based safety risk coupling of prefabricated building hoisting, Sensors, 21(11) (2021) 3583.
[48] Z. Yuan, Y. Chang, Y. Chen, Y. Wang, W. Huang, C. Chen, Simulating and optimizing precast wall lifting in prefabricated building construction, Engineering, Construction and Architectural Management, (2022) (ahead-of-print).
[49] Y. Zhao, C. Cao, Z. Liu, A framework for prefabricated component hoisting management systems based on digital twin technology, Buildings, 12(3) (2022) 276.
[50] H. Ding, M. Li, R. Zhong, G. Huang, Multistage self-adaptive decision-making mechanism for prefabricated building modules with IoT-enabled graduation manufacturing system, Automation in Construction, 148 (2023) 104755.
[51] J.G.B. Wesz, C.T. Formoso, P. Tzortzopoulos, Planning and controlling design in engineered-to-order prefabricated building systems, Engineering, Construction and Architectural Management, 25(2) (2018) 134-152.
[52] L. Chen, C. Zhai, L. Wang, X. Hu, X. Huang, Modular structure construction progress scenario: a case study of an emergency hospital to address the COVID-19 PANDEMIC, Sustainability, 14(18) (2022) 11243.
[53] M. Chatzimichailidou, Y. Ma, Using BIM in the safety risk management of modular construction, Safety science, 154 (2022) 105852.
[54] A. Tažiková, A. Z. Struková, The impact of logistics on the cost of prefabricated construction, Acta Logistica, 8(1) (2021) 65-71.
[55] S. Azhar, M.Y. Lukkad, I. Ahmad, An investigation of critical factors and constraints for selecting modular construction over conventional stick-built technique, International Journal of Construction Education and Research, 9(3) (2013) 203-225.
[56] Z. Li, G.Q. Shen, X. Xue, Critical review of the research on the management of prefabricated construction, Habitat international, 43 (2014) 240-249.
[57] L. Mayra, D. La Torre, A review and analysis of modular construction practices, Lehigh University, 1994.
[58] K.-C. Shih, S.-S. Liu, C.-N. Huang, Precast storage and transportation planning via component zoning optimization, Robotics and Automation in Construction, (2008) 159-174.
[59] G.H. Lee, J.I. Kim, C. Koo, T.W. Kim, Automated generation of precast concrete slab stacks for transportation in offsite construction projects, Journal of Construction Engineering and Management, 148(8) (2022) 04022072.
[60] Y. Lee, JI. Kim, A. Khanzode, M. Fischer, Empirical study of identifying logistical problems in prefabricated interior wall panel construction, Journal of Management in Engineering, 37(3) (2021) 05021002.
[61] Y. Lee, JI. Kim, F. Flager, M. Fischer, Methodology to estimate logistics costs for vertically transported prefabricated wall panels. Journal of Computational Design and Engineering, 9(4) (2022) 1348-1368.
[62] J.Y. Jang, j.i. Kim, C. Koo, T.W. Kim, Automated Components–Vehicle Allocation Planning for Precast Concrete Projects, Journal of Management in Engineering, 38(6) (2022) 04022059.
[63] M. Hussein, A. Karam, A. Elttoukhy, A. Darko, T. Zayed, Optimized multimodal logistics planning of modular integrated construction using hybrid multi-agent and metamodeling, Automation in Construction, 145 (2023) 104637.
[64] R.Y. Zhong, Y. Peng, F. Xue, J. Fang, W. Zou, H. Luo, S. Thomas Ng, W. Lu, G. Shen, G. Huang, Prefabricated construction enabled by the Internet-of-Things, Automation in Construction, 76 (2017) 59-70.
[65] X. Yang, Optimization Algorithm of Logistics Transportation Cost of Prefabricated Building Components for Project Management, Journal of Mathematics, 2022(1) (2022) 1460335.
[66] L.S. Pheng, C.J. Chuan, Just-in-time management of precast concrete components, Journal of construction engineering and management, 127(6) (2001) 494-501.
[67] J. Liu, M.-F.F. Siu, M. Lu, Modular construction system simulation incorporating off-shore fabrication and multi-mode transportation, in: 2016 Winter Simulation Conference (WSC), 2016.
[68] J.Y. Jang, S. Ahn, T.W. Kim, Cloud-based information system for automated precast concrete transportation planning, Automation in Construction, 152 (2023) 104942.
[69] D. Liu, X. Li, J. Chen, R. Jin, Real‐Time Optimization of Precast Concrete Component Transportation and Storage, Advances in Civil Engineering, 2020(1) (2020) 5714910.
[70] C. Kogler, P. Rauch, Lead time and quality driven transport strategies for the wood supply chain, Research in Transportation Business & Management, 47 (2023) 100946.
[71] Y. Dan, G. Liu, Integrated scheduling optimization of production and transportation for precast component with delivery time window, Engineering, Construction and Architectural Management, (2023).
[72] M. Almashaqbeh, K. El-Rayes, Minimizing transportation cost of prefabricated modules in modular construction projects, Engineering, Construction and Architectural Management, 29(10) (2022) 3847-3867.
[73] M. Li, Z. Guo, Research on Transportation Safety of Prefabricated Building Components, Civil Engineering Journal, 31(4) (2022) 613.
[74] R. Bortolini, C.T. Formoso, D.D. Viana, Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling, Automation in Construction, 98 (2019) 248-264.
[75] S.J. Ahn, S. Han, M.S. Altaf, M. Al-Hussein, Integrating off-site and on-site panelized construction schedules using fleet dispatching, Automation in Construction, 137 (2022) 104201.
[76] Z. Zhang, Z. Yuan, G. Ni, H. Lin, Y. Lu, The quality traceability system for prefabricated buildings using blockchain: An integrated framework, Frontiers of engineering management, 7(4) (2020) 528-546.
[77] E. Ergen, B. Akinci, R. Sacks, Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS, Automation in construction, 16(3) (2007) 354-367.
[78] Y. Pan, J. Wang, Research on Selection of Logistics Supplier in the Process of Housing Industrialization. in: 20th International Symposium on Advancement of Construction Management and Real Estate, 2017.
[79] Y. Dan, G. Liu, Integrated scheduling optimization of production and transportation for precast component with delivery time window, Engineering, Construction and Architectural Management, 2023.
[80] X. Yang, Optimization algorithm of logistics transportation cost of prefabricated building components for project management, Journal of Mathematics, (2022) 1-9.
[81] Z. Wang, H. Hu, J. Gong, X. Ma, W. Xiong, Precast supply chain management in off-site construction: A critical literature review, Journal of Cleaner Production, 232 (2019) 1204-1217.