Keywords = Building Information Modeling (BIM)
BWM-Method Prioritizing of Clashes Detected During the Construction Design Phase with Building Information Modeling (BIM)

Articles in Press, Accepted Manuscript, Available Online from 28 November 2024

10.22060/ajce.2024.22593.5836

Iman Bitaraf; ali akbar shirzadi javid


BIM-based resource trade-off in dam project scheduling using Atomic Orbital Search (AOS) algorithm

Volume 6, Issue 4, December 2022, Pages 469-492

10.22060/ajce.2023.22042.5818

Milad Baghalzadeh Shishehgarkhaneh; Sina Fardmoradinia; Afram Keivani; Mahdi Azizi